A Comprehensive EZ Street Asphalt Installation Guide
Posted by Bryony Bolland - Red Stag Materials on 12th Sep 2024
Ensure your repair area has a complete edge all the way around (this can be achieved by cutting or chipping the surface to create the edge - recommended cut depth is 50mm).
Brush away loose debris out of the repair area - EZ Street will work in water/rain.
Compact the area inside the defect and apply first layer of EZ Street (Max layer lift should not exceed 50mm for deep
…