null Skip to main content

How to Repair Potholes In Freezing Conditions With EZ Street Asphalt®

Posted by Bryony Bolland - Red Stag Materials on 15th Dec 2025

How to Repair Potholes In Freezing Conditions With EZ Street Asphalt®

Winter presents some of the most challenging conditions for pothole repairs. Freezing temperatures, wet surfaces, and reduced daylight often make traditional asphalt repairs impractical or impossible. However, leaving potholes untreated can lead to rapid deterioration, increased vehicle damage, and higher long-term repair costs.

EZ Street Asphalt offers a performance-proven, reliable solution for permanent pothole repairs in freezing conditions, allowing crews to work safely and effectively throughout winter.

Why Traditional Asphalt Fails in Cold Weather

Hot mix asphalt requires dry conditions and high application temperatures to bond correctly. In winter, this creates several issues:

  • Hot asphalt cools too quickly to compact properly

  • Moisture and frost prevent effective bonding

  • Crews are forced to delay works, increasing network deterioration

EZ Street Asphalt is specifically designed to overcome these challenges.

What Makes EZ Street Asphalt® Different?

EZ Street Asphalt® is a cold-applied, polymer-modified asphalt that performs in temperatures as low as -20°C. It requires no heating, no specialist equipment, and can be installed directly into damp or frozen potholes.

Key benefits include:

  • Works in freezing and wet conditions

  • Permanent repair, not a temporary fix

  • No minimum road temperature required

  • Can be trafficked immediately after compaction

  • Supplied in convenient bags or bulk options

This makes it ideal for winter maintenance, emergency repairs, and reactive works.

Step-by-Step: Repairing a Pothole in Freezing Conditions

1. Clear the Pothole
Remove loose debris and large chunks of ice, pooled water is fine. Ensiring the pothole has a clear edge will result in a permanent repair.

2. Apply EZ Street Asphalt
Enjoy unparalleled workability, even in freezing conditions. Pour the EZ Street Asphalt directly into the pothole. Fill in 1 inch increments for deep potholes, compacting between each layer. Ensure there is a 1 inch lip of overfill to allow for final compaction.

3. Compact Thoroughly
Use a hand tamper or compactor plate compact the material firmly. Proper compaction is essential for success.

4. Open to Traffic Immediately
Once compacted, the repair can be trafficked straight away, no curing time required!

Even in cold winter conditions, EZ Street Asphalt continues to cure over time, forming a durable repair that resists water ingress and freeze-thaw damage.

Ideal for Winter Maintenance Programmes

EZ Street Asphalt is widely used by local authorities, utilities, and contractors who need a dependable winter repair solution. It reduces repeat visits, improves safety, and helps maintain road networks when traditional materials cannot be used.

Stocking EZ Street Asphalt before winter sets in ensures you are prepared for reactive pothole repairs, adverse weather events, and emergency call-outs.

Christmas Ordering Cut-Off

Please note: the order cut-off before we close for the Christmas break is 17th December 2025.
To ensure continuity of winter repair works, we strongly recommend placing orders in advance.

If you would like advice on quantities, storage, or suitability for your application, the Red Stag Materials team is happy to help.

 SHOP NOW